SPX Cooling Technologies 800 ユーザーズマニュアル

ページ / 28
         
Inspection Checklist
Date Inspected
Inspected By
Owner
Location
Owner's Tower Designation
Tower Manufacturer
Model No.
Serial No.
Process Served by Tower
Operation:
Continuous ❏  Intermittent ❏     Seasonal ❏
Design Conditions
GPM
    HW
°F
   CW
°F
   WB
°F
Cell No.
Number of Fan Cells
Tower Type: Counterflow
Date Tower was installed
Condition:  1—Good    2—Keep an eye on it    3—Needs immediate attention
1 2 3
Comments
Structure
Casing Material
Structural Material
Fan Deck Material
Stairway ❏
Material
Ladder
Material
Handrail ❏
Material
Interior Walkway ❏
Material
Cold Water Basin Material
Water Distribution System
Spray Type System
Header Pipe Material
Branch Pipe Material
Nozzles—orifice diameter
 size  in.
Up spray ❏ Down spray ❏
Heat Transfer System
Fill—type & material
Eliminators—type & material
Louvers—type & material
Use this space to list specific items needing attention: