Hearth & Home Technologies SL-350TRS-CE-D ユーザーズマニュアル
Heat & Glo • SL-350TRS-CE-D • 2033-900 Rev. N • 10/07
32
Figure 40
The gas line should be
installed by a qualified
service technician.
installed by a qualified
service technician.
!
Step 6
The Gas
Supply Line
The Gas
Supply Line
NOTE: Have the gas supply line installed by a
qualified service technician in accordance with
all building regulations.
qualified service technician in accordance with
all building regulations.
NOTE: Before the first firing of the stove, the
gas supply line should be purged of any trapped air.
gas supply line should be purged of any trapped air.
NOTE: Consult local building regulations to
properly size the gas supply line leading to the
(Rp 1/2”) hook-up at the unit.
properly size the gas supply line leading to the
(Rp 1/2”) hook-up at the unit.
This gas inlet connection is ISO 7-Rp 1/2 (BSP Rp 1/2).
To install the gas supply line:
• When attaching the pipe, support the control so
• When attaching the pipe, support the control so
that the lines are not bent or torn.
• After the gas line installation is complete, use a
soap solution to carefully check all gas connec-
tions for leaks.
tions for leaks.
WARNING:
DO NOT USE AN OPEN FLAME TO
CHECK FOR GAS LEAKS.
DO NOT USE AN OPEN FLAME TO
CHECK FOR GAS LEAKS.
• At the gas line access hole, use insulation to
repack the space around the gas pipe.
• Insert insulation from the outside of the fireplace
and pack the insulation tightly to totally seal
between the pipe and the outer casing.
between the pipe and the outer casing.
GAS
ACCESS