GAS BOILER SYSTEM COMMISSIONING CHECKLIST
CONTROLS
 Tick the appropriate boxes
Time and Temperature Control to Heating  
Room Thermostat and   
Programmable    
Load/Weather  
Optimum 
Start 
 Programmer/Timer 
 
 
Room Thermostat  
 
Compensation  
 
 Control 
 
Time and Temperature Control to Hot Water  
Cylinder Thermostat and Programmer/Timer  
 
 Combination 
Boiler 
 
Heating Zone Valves 
   
   
Fitted  
 
 Not 
Required 
 
 
Hot Water Zone Valves 
   
   
Fitted  
 
 Not 
Required 
 
 
Thermostatic Radiator Valves 
   
   
Fitted  
 
 Not 
Required 
 
 
Automatic Bypass to System 
   
   
Fitted  
 
 Not 
Required 
 
 
Boiler Interlock 
   
   
   
Provided  
 
ALL SYSTEMS 
The system has been fl ushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions 
Yes 
What system cleaner was used?  
 
What inhibitor was used?  
Quantity 
 litres
CENTRAL HEATING MODE
 Measure and Record:
Gas Rate 
 
 m
3
/hr OR 
 
 
 
 ft
3
/hr
Burner Operating Pressure (if applicable)  
 
 mbar 
OR 
Gas Inlet Pressure  
 mbar
Central Heating Flow Temperature 
 
 °C
Central Heating Return Temperature 
 
 °C
COMBINATION BOILERS ONLY
 
Is the installation in a hard water area (above 200ppm)? 
Yes 
  No 
If yes, has a water scale reducer been fi tted? 
Yes 
  No 
What type of scale reducer has been fi tted?
DOMESTIC HOT WATER MODE Measure and Record:
Gas Rate 
 
 
 m
3
/hr OR   
 
 
 
 ft
3
/hr
Burner Operating Pressure (at maximum rate)  
 
 
 mbar 
OR 
Gas Inlet Pressure (at maximum rate) 
 mbar
Cold Water Inlet Temperature 
 
 
 
 
 
 °C
Hot water has been checked at all outlets      
Yes 
   Temperature 
 °C
Water Flow Rate 
 
 
 
  
 
 l/min
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 
Yes 
ALL INSTALLATIONS 
 
If required by the manufacturer, record the following 
CO
2
 
 %   OR    CO 
 ppm   OR   CO/CO
Ratio  
The heating and hot water system complies with the appropriate Building Regulations 
 
 
Yes 
  
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions 
Yes 
 
The operation of the boiler and system controls have been demonstrated to and understood by the customer 
Yes 
  
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer 
Yes 
 
*
 All installations in England and Wales must be notifi ed to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. 
A Building Regulations Compliance Certifi cate will then be issued to the customer.  
  ©Heating and Hotwater Industry Council (HHIC)   
www.centralheating.co.uk
Commissioning Engineer’s Signature
Customer’s Signature
(To confi rm satisfactory demonstration and receipt of manufacturer’s literature)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating 
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.  
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.      
Customer Name  
Telephone Number
Address 
Boiler Make and Model 
Boiler Serial Number 
Commissioned by (print name) 
CORGI ID Number
Company Name 
Telephone Number
Company Address
 
 
Commissioning Date 
To be completed by the customer on receipt of a Building Regulations Compliance Certifi cate
*
:
Building Regulations Notifi cation Number (if applicable)