Lucent Technologies Release 6 Manual Do Utilizador

Página de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Test the System 
Page 4-10
Test Tone-Clock for each EPN 
4
Test Tone-Clock for each EPN
1. Verify the screen displays: 
Command:
2. Type test tone-clock 2A
 
(where 2A is the cabinet and carrier number for 
one of the Tone-Clocks installed) and press 
Enter
.
NOTE:
Circuit pack positions are usually given by cabinet, carrier, and slot. 
They may also be given by port. The term “cabinet” refers to 1 
Multi-Carrier Cabinet making up one port network. A port network is 
defined as a group of cabinets connected together with 1 TDM bus.
If any result is 
FAIL
, check the associated TDM bus cables and 
intercabinet cables in the EPN.
3. Repeat Step 2 for each installed Tone-Clock circuit pack.
Test Tone-Clock Interchange for each 
EPN
Critical reliability only.
1. Verify the screen displays: 
Command:
2. Type status system all-cabinets
 
and press 
Enter
. This displays the 
location of the Standby Tone-Clock.
3. Type set tone-clock xxx
 
(where xxx is the port network/carrier for the 
standby tone-clock). Press 
Enter.
4. Type status system all-cabinets and press 
Enter
.
5. Verify the duplicated Tone-Clock is active using the information displayed 
on the screen.
If any problems are indicated, check the TDM cables in the associated 
EPN.