Lucent Technologies Release 6 Manual Do Utilizador

Página de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Cable Ductwork 
Page C-14
 
C
Install Cross-Aisle to Wall Trough
Refer to 
Figure C-9
 to assemble the ductwork:
1. Install wall mounting bracket to designated location. Hardware to mount 
bracket should be determined according to wall type and should be 
locally provided.
2. Use thread-forming screws to attach the 3-hole face of the angle bracket 
to the I/O trough.
3. Attach the angle bracket to the 6-hole face of the cross-aisle bracket using 
three 10-24 X 3/4 inch screws, connected to nuts and washers through the 
bottom holes.
4. Attach the I/O cable duct to the cross-aisle bracket using the 
thread-forming screws. Attach the other end of the I/O duct to the wall 
mounting using 10-24 X 3/4 inch screws, nuts and washers.
Figure C-9.
Installation of I/O Cross-Aisle to Wall Trough
Figure Notes
1. Angle Bracket
2. I/O Trough
3. Cross-Aisle Bracket
4. I/O Cable Duct
5. Wall Mounting Bracket
6. Front of Cabinet
duct5 KLC 071796