Lucent Technologies Release 6 Manual Do Utilizador

Página de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Cable Ductwork 
Page C-16
 
C
Install I/O Cable Rack Riser
Refer to 
Figure C-11
 and assemble the ductwork:
1. Attach angle bracket (group 9) to I/O trough using thread-forming screws.
2. Attach cross-aisle bracket to angle bracket using thread-forming screws. 
Attach the angle bracket to the 6-hole face of the cross-aisle bracket using 
three thread-forming screws through the bottom holes.
3. Attach I/O coupling trough (group 8) to cross-aisle bracket using 
thread-forming screws.
4. Attach cable rack to coupling trough using locally-provided coupling 
plates and 3/8-18 x 1/2 inch hex bolts and nuts.
5. Attach other end of cable rack to wall using locally provided hardware 
suitable to type of wall.
Figure C-11.
Installation of I/O Cable Rack Riser to End of Cabinet (Group 9)
Figure Notes
1. I/O Trough
2. Angle Bracket
3. Coupling Plate
4. Cable Rack
5. I/O Coupling Trough
6. Cross-Aisle Bracket
7. Front of Cabinet
duct7 KLC 071796