  Gemini™ Twin-Fuel Gas-Fired Boiler 
 
Gas Pressure Adjustment 
Test of Motorized Gas Valves 
 
 
 
 
4.2  G
AS 
P
IPING
 
 
Before making the gas hook-up, make sure the boiler 
is being supplied only with the fuels shown on the 
boiler nameplate.  The boiler is designed to operate on 
vaporized natural gas and propane only.  Do not use 
any type of liquid fuel.  Do not attempt to fuel the 
boiler with MAPP gas, sewage gas, coal gas, or other 
fuels. 
Gas train connection sizes are shown in the Gas Train 
Connection table on the previous page for the different 
models available. 
The boiler shall be installed such that the gas ignition 
system components are protected from water (drip-
ping, spraying, rain, etc.) during appliance operation 
and service (circulator replacement, control replace-
ment, etc.). 
The two gas pressure regulators supplied with the 
boiler are set during a factory fire-test to provide the 
proper pressure to the main burner: 6 inches W.C. in-
let pressure to the regulators for both natural gas and 
propane.   
The gas train components are designed to handle a 
maximum inlet pressure of 14 inches W.C.(1/2 psig).  
If the available gas pressure exceeds 14 inches W.C. 
on either the natural gas or propane supply a suitable 
intermediate gas pressure regulator of the "lock up" 
type must be provided to reduce the pressure to less 
than 14 inches W.C.  All boilers are designed to oper-
ate at rated input with a minimum inlet pressure of 6 
inches W.C. with natural gas, 6 inches W.C. with LP 
gas. 
 
shutoff
(on boiler)
union
drip leg
remote gas shutoff
(not supplied)
meter
natural gas
supply
propane
supply
shutoff
(on boiler)
union
drip leg
remote gas shutoff
(not supplied)
 
 
Figure 4-2  Gas Supply Piping 
(Refer to table above for connection sizes.) 
 
Install a sediment trap (drip leg) and a union connec-
tion ahead of the primary manual shutoff valves on the 
boiler as shown in the figure above.   
All gas piping must be installed in accordance with 
National Fuel Gas Code, ANSI Z223.1, latest edition, 
and any other local codes which may apply; in Canada 
gas piping must be installed in accordance with CAN-
B 149. 
 
General Warning
 
Warning!  All threaded connections must be made us-
ing a pipe compound that is resistant to the action of 
liquefied petroleum gases.  Do not use Teflon
ä tape 
on gas line threads. 
 
 
The boiler and all gas piping connections must be 
pressure tested and must be checked for leaks before 
being placed into service.  Test with compressed air or 
gas if possible.  
The boiler must be disconnected at both boiler manual 
 
 