Справочник Пользователя для American Standard Saver Bath Walls

Скачать
Страница из 7
3
7 5 4 74 8 - 10 0   Rev.  C
1
2
INSTALLATION PROCEDURES:
If you plan to install a bath/shower door, a 1 x 4 must be installed in the pocket on the back of both side walls. 
A) Cut one end of the 1 x 4 to 45° as shown. (Fig.1) Then cut the 1 x 4 to a length of 57-1/2".   
B) Apply a bead of tub surround adhesive in the pocket of each side wall. With 45° cut end down and angle facing out, 
     attach  board butting up to the top of the pocket. Allow time to cure.
A) Position the three panels into the alcove. Lower each
     panel onto the bathtub to ensure that the panels fit 
     properly  in the alcove. 
B) Mark the appropriate side panel (right or left) cutouts for
     plumbing fixtures. Refer to plumbing fixture installation
     instructions for  hole dimensions and placement. Carefully
     locate, mark and cut holes using the properly sized 
     hole saw. 
C) When satisfied with fit, mark a line across the top of the
     panels on each stud. Remove the panels. The marked
     line will help align the panels in subsequent steps.
Nailing
flange
Nailing flange
(top)
Nailing flange
(top)
Tub 
Surround
Adhesive
Wall pocket
(back)
Wall pocket
(front)
1 x 4
(Butt to top 
of pocket)
Back view of 
side wall. 
Typical of both 
side walls.
Front view of side 
wall. Typical of 
both side walls.
71-1/2"
(1816mm)
Shower
Base
57-1/2"
(1461mm)
Tub
1 x 4
(Butt to top 
of pocket)
1 x 4
WALL 
POCKET
(FRONT)
Fig. 1
45°
Cut
WALL 
NAILING 
FLANGE
TUBTILE 
FLANGE
TUB 
SURROUND
ADHESIVE
Top Nailing flange
Front Nailing Flange
Mark for 
plumbing 
fixtures
Bath Tub