Справочник Пользователя для Regency P33-LP4

Скачать
Страница из 52
Regency
®
 P33-4 Zero Clearance Direct Vent Gas Fireplace
13
Termination Cap
Wall Thimble 2 pieces
(10" (254mm) Outer Diameter)
2” x 4” or 2” x 6”
(21mm x 102mm
or 21mm x 152mm)
6-7/8"
(175mm)
dia. air intake
4" (102mm)
dia. flue pipe
with spring spacer
Screws
(4 per connection)
Screws
(3 per
connection)
INSTALLATION PROCEDURES
for Regency
®
 Direct Vent System (Flex)
Minimum and Maximum Vent Clearances
INSTALLATION
1)  Locate the unit in the framing, rough in the 
gas (preferably on the right side of the unit) 
and the electrical (Junction block is on the 
left side) on the left. Locate the centerline of 
the termination and mark wall accordingly. 
Cut a 10"(254mm) hole in the wall (inside 
dimension).
Note: To make the installation more 
aesthetically pleasing, we recommend 
framing out a square to mount the 
terminal to.
*If this is an outside corner, the minimum distance between the vent and the outside 
corner is 6" (15cm) with AstroCap termination cap or 12" (30cm) with Dura-Vent  
termination cap. See "F" in the diagram in "Exterior Vent Trmination Locations" 
Section.
Note:  A 2-1/2" (64mm) horizontal top and 
1-1/2" (38mm) horizontal sides & 
bottom clearance around the liner 
must be maintained except that only 
a 1" (25mm) clearance is needed at 
the termination end. We recommend 
framing a 10"(254mm) x 10"(254mm) 
(inside dimensions) hole to give 
structural rigidity for mounting the 
termination.
Note:  If installing termination on a siding 
covered wall,  furring strips must be 
used to ensure that the termination 
is not recessed into the siding.
2)  Level the fi replace and fasten it to the framing 
using nails or screws through the nailing 
strips.
3)  Assemble the vent assembly by applying 
Mill Pac to the 4"(100mm) inner collar of the 
termination and  slipping the 4"(100mm) liner 
over it at least 1-3/8" (35mm). Fasten with 
the 3 screws (drilling pilot holes will make this 
easier). Apply Mill Pac or high temperature 
silicone to the 6-7/8"(175mm) fl ex pipe and 
slip it over the 6-7/8" outer collar of the vent 
terminal at least 1-3/8"(35mm) and fasten 
with the 3 screws.
4)  Separate the 2 halves of the wall thimble and 
securely fasten the one with the tabs to the 
outside wall making sure that the tabs are 
on top and bottom. Fasten the other thimble 
half to the inside wall. The thimble halves 
slip inside each other and can be adjusted 
for 2 x 4 or 2 x 6 walls. The liners must slip 
over the collars a minimum of 1-3/8".
5)  Slip the assembled liner and termination 
assembly through the thimble making sure 
the termination cap faces up (there are 
markings on the cap that show which way 
is up). This will position the termination cap 
with proper down slope for draining water. 
Fasten the cap to the outer wall with the 4 
supplied screws. 
6)  Pull the centre 4"(100mm) liner and outer 
6-7/8"(175mm) liner out enough to slip over 
the fl ue collars of the fi replace. 
7)  Apply Mill Pac over the fi replace inner collar 
and slip the 4"(100mm) liner down over it 
and attach with 3 supplied screws.
8)  Do the same with the 6-7/8"(175mm) 
liner.
9)  Apply a bead of silicone between the 
thimble and termination and around the 
outer edge of the terminal at the wall in 
order to keep the water out.
IMPORTANT: Do not locate termination 
hood where excessive snow or ice 
buildup may occur. Be sure to check 
vent termination area after snow 
falls, and clear to prevent accidental 
blockage of venting system. When 
using snow blowers, make sure 
snow is not directed towards vent 
termination area.