 Caution:
Place a wet towel on the refrigerant service valve before heating the brazed 
• 
section to keep the temperature of the valve from exceeding 120 ˚C.
Direct the flame away from the wiring and metal sheets inside the unit 
• 
to prevent heat damage.
 Caution:
Do not vent R410A into the atmosphere.
• 
R410A is a Fluorinated Greenhouse gas, covered by the Kyoto 
• 
Protocol, with a Global Warming Potential (GWP) = 1975.
Refrigerant pipe connection
• 
This product includes connecting pipes for front piping and bottom post-
piping. (Refer to [Fig.10.2.2])
Check the liquid/gas piping dimensions before connecting the refrigerant pipe.
Refer to item 9.2 Refrigerant piping system for piping dimensions.
Make sure that the refrigerant pipe is not touching other refrigerants pipes, 
unit panels, or base plates.
Be sure to use non-oxidative brazing when connecting pipes.
Be careful not to burn the wiring and plate when brazing.
<Refrigerant piping connection examples>
[Fig.10.2.2] (P.7)
<A> Front pipe routing
<B> Bottom pipe routing
<C> Included with outdoor unit
A
Gas pipe (field supply required)
B
Liquid pipe (field supply required)
C
Shape
Front pipe routing
• 
Liquid
side
P200,P250,EP200 Use the included connecting pipe d to connect.
P300
Use the included connecting pipe 4 and e to connect.
P300*2 *3
Use the included connecting pipe e to connect.
EP250, EP300
Use the included connecting pipe 5 and f to connect.
EP250*1, EP300*2 *3 
P350, P400
Use the included connecting pipe 7 and f to connect.
P400*3, P450
Use the included connecting pipe f to connect.
Gas 
side
P200
Use the included elbow 1 to connect.
EP200
Use the included elbow 2 and connecting pipe 9 to connect.
P250, EP250, P300 Use the included elbow 2 and connecting pipe 0 to connect.
EP300
Use the included elbow 3 and connecting pipe a to connect.
P350, P400
Use the included elbow 2 and connecting pipe b to connect.
P450
Use the included elbow 3 to connect.
Bottom pipe routing
• 
*1 Over 90m
*2 Over 40m
*3 In the case the unit is used in combination with other outdoor units.
*4 EP650YSJM-A : Use the included connecting pipe 6 , 8, and c to connect to the  
 
twinning kit.
*5 EP700YSJM-A1 : Use the included connecting pipe 6 to connect to the twinning kit.
*6 EP750YSJM-A1 : Use the included connecting pipe 6 to connect to the twinning kit.
(*4~*6: Refer to item 9.2.)
Satisfy the minimum insertion depth in the table below when expanding on-site piping
Pipe diameter (mm)
Minimum insertion depth (mm)
5 or more less than 8
6
8 or more less than 12
7
12 or more  less than 16
8
16 or more  less than 25
10
25 or more  less than 35
12
35 or more  less than 45
14
After evacuation and refrigerant charging, ensure that the handle is fully 
• 
open. If operating with the valve closed, abnormal pressure will be imparted 
to the high- or low-pressure side of the refrigerant circuit, giving damage to 
the compressor, four-way valve, etc. 
At the 
conditions 
below:
<Example>
Indoor
1: 125 A: ø12.7
40 m a: ø9.52
10 m
2: 100 B: ø9.52
10 m b: ø9.52
5 m
3: 40
C: ø9.52
15 m c: ø6.35
10 m
4: 32
D: ø9.52
10 m d: ø6.35
10 m
5: 63
e: ø9.52
10 m
The total length of each liquid line is as follows:
ø12.7: A = 40 = 40 m
ø9.52: B + C + D + a + b + e = 10 + 15 + 10 + 10 + 5 + 10 = 60 m
ø6.35: c + d = 10 + 10 = 20 m
Therefore,
<Calculation example>
Additional refrigerant charge
  = 40 × 0.12 + 60 × 0.06 + 20 × 0.024 + 3.5 = 12.4 kg
Value of α
Total capacity of connecting indoor units
α
 
Models 
 ~  80
2.0 kg
 
Models  81 ~  160
2.5 kg
 
Models  161 ~  330
3.0 kg
 
Models  331 ~  390
3.5 kg
 
Models  391 ~  480
4.5 kg
 
Models  481 ~  630
5.0 kg
 
Models  631 ~  710
6.0 kg
 
Models  711 ~  800
8.0 kg
 
Models  801 ~  890
9.0 kg
 
Models  891 ~ 1070
10.0 kg
 
Models 1071 ~ 1250
12.0 kg
 
Models 1251 ~
14.0 kg
10.2. Precautions concerning piping 
connection and valve operation
Conduct piping connection and valve operation accurately and carefully.
• 
Removing the pinched connecting pipe
• 
When shipped, a pinched connecting pipe is attached to the on-site liquid 
and gas valves to prevent gas leakage.
Take the following steps 1 through 4 to remove the pinched connecting 
pipe before connecting refrigerant pipes to the outdoor unit.
1
  Check that the refrigerant service valve is fully closed (turned clockwise 
all the way).
2
  Connect a charging hose to the service port on the liquid/gas refrigerant 
service valve, and extract the gas in the pipe section between the 
refrigerant service valve and the pinched connecting pipe.
3
  After vacuuming gas from the pinched connecting pipe, sever the 
pinched connecting pipe at the location shown in [Fig.10.2.1] and drain 
the refrigerant.
4
  After completing 2 and 3 heat the brazed section to remove the 
pinched connecting pipe.
[Fig. 10.2.1] (P.7)
<A> Refrigerant service valve (liquid side/brazed type)
<B> Refrigerant service valve (gas side/brazed type)
A
Shaft
Fully closed at the factory, when connecting the piping, and when 
vacuuming. Open fully after these operations are completed.
<When opening>
• Turn the shaft counterclockwise with a hexagonal wrench.
• Turn around the shaft until it stops.
<When closing>
• Turn the shaft clockwise with a hexagonal wrench.
• Turn around the shaft until it stops.
B
Shaft
Fully closed at the factory, when connecting the piping, and when 
vacuuming. Open fully after these operations are completed.
<When opening>
• Turn the shaft counterclockwise.
• Turn around the shaft until it stops.
<When closing>
• Turn the shaft clockwise.
• Turn around the shaft until it stops.
C
Stopper pin
Prevents the shaft from turning 90° or more.
D
Service port
Available for gas venting of the pinched connecting pipe, or vacuuming in the 
refrigerant pipes on the site.
E
Cap
Remove the cap before operating the shaft. Be sure to return it to the original 
position after completing the operation.
F
Pinched connecting pipe severing portion
G
Pinched connecting pipe brazing portion
 Warning:
The sections between the refrigerant service valves and the pinched 
• 
connecting pipes are filled with gas and refrigerant oil. Extract the gas 
and refrigerant oil in the above-mentioned pipe section before heating 
the brazed section to remove the refrigerant service valve pinched 
connecting pipe.  
-  If the brazed section is heated without first extracting the gas and 
refrigerant oil, the pipe may burst or the pinched connecting pipe may blow 
off and ignite the refrigerant oil, causing serious injury.
Liquid
side
P200, P250, EP200 Expand the liquid side on-site piping (ID ø9.52) 
and connect to the refrigerant service valve piping.
P300
Use the included connecting pipe 4 to connect.
P300*2 *3
Expand the liquid side on-site piping (ID ø12.7) 
and connect to the refrigerant service valve piping.
EP250, EP300
Use the included connecting pipe 5 to connect.
EP250*1, EP300*2 *3, 
P350, P400
Use the included connecting pipe 7 to connect.
P400*3, P450
Expand the liquid side on-site piping (ID ø15.88) 
and connect to the refrigerant service valve piping.
Gas 
side
P200
Expand the gas side on-site piping (ID ø19.05) 
and connect to the refrigerant service valve piping.
EP200
Use the included connecting pipe 9 to connect.
P250, EP250, P300 Use the included connecting pipe 0 to connect.
EP300
Use the included connecting pipe a to connect.
P350, P400
Use the included connecting pipe b to connect.
P450
Expand the gas side on-site piping (ID ø28.58) 
and connect to the refrigerant service valve piping.
WT05962X01_GB.indd   17