Справочник Пользователя для Lennox International Inc. GWB9-075IH-2

Скачать
Страница из 56
11
Clean the System First
Before connecting boiler to heating system, clean and fl ush 
system thoroughly. Verify system is free of sediment, fl ux 
and any residual boiler water additives.
Systems having antifreeze not recommended must be 
completely fl ushed to insure no old antifreeze remains. 
In older systems obviously discolored, murky or dirty 
water; or pH reading outside acceptable range (between 
7.0 and 8.0) are indications the system should be cleaned 
or treated. Thoroughly fl ush system with clean water to 
remove any sediment or contaminants. Sludge and iron 
oxide deposits can cause rapid breakdown of inhibitors.
Flushing with clean water. If chemical cleaners are used, 
use only those recommended for use with aluminum 
boilers. Follow chemical cleaner manufacturer’s instructions 
completely.
DO NOT
 mix different manufacturer’s products.
• When boiler installation is for new heating system, 
install all of radiation units (panels, radiators, 
baseboard, or tubing) and supply and return mains. 
• After all heating system piping and components 
have been installed, make fi nal connection of system 
piping to boiler. A hot water boiler installed above 
radiation level, or as required by the Authority having 
jurisdiction, must be equipped with low water cut off 
device. 
• Periodic inspection is necessary for fl ushing of fl oat 
type devices, per low water cut off manufacturers 
specifi c instructions.
 NEAR BOILER PIPING
Supply And Return Lines
• Boiler is set up to receive 1 ¼” NPT supply and return 
piping from top access. 
• Boiler may be piped from left side by turning supply 
elbow. 
• Install furnished dielectric unions at boiler supply and 
return lines prior to making system piping connections
• Do Not install copper supply and return piping directly 
into aluminum boiler section casings due to galvanic 
corrosion between dissimilar metals. 
• Must use provided dielectric unions between copper 
system piping and boiler to make fi nal connection to 
boiler. 
• Furnished circulator pump can be installed at installer 
preferred location.