Справочник Пользователя для Lennox International Inc. GWB8-187IE-2

Скачать
Страница из 32
5
INSTALLATION PROCEDURE
WARNING
Improper installation, adjustment, alteration, service 
or maintenance could result in death or serious 
injury
.
!
   
1. 
The installation must conform to the requirements of 
the authority having jurisdiction or, in the absence 
of such requirements, to the National Fuel Gas Code, 
ANSI Z223.1/NFPA 54, and/or Natural Gas and Propane 
Installation Code, CAN/CSA B149.1
2. 
Where required by authority having jurisdiction, 
installation must conform to the Standard for Controls 
and Safety Devices for Automatically fi red Boilers, 
ANSI/ASME CSD-1.
3. 
This boiler series is classifi ed as a Category I.  Vent 
installation shall be in accordance with “Venting of 
Equipment ,” of the National Fuel Gas Code, ANSI 
Z223.1/NFPA 54, or “Venting Systems and Air Supply 
for Appliances,” of the Natural Gas and Propane 
Installation Code, CAN/CSA B149.1, or applicable 
provisions of the local building codes. 
4. 
Boiler has met safe lighting and other performance 
criteria with gas manifold and control assembly on 
boiler per latest revision of ANSI Z21.13/CGA 4.9.
5. 
Install such that gas ignition system components are 
protected from water (dripping, spraying, rain, etc.) 
during appliance operation and service, (circulator 
replacement, condensate trap, control replacement, 
etc.).
6. 
Locate boiler on level, solid base as near chimney as 
possible and centrally located with respect to heat 
distribution system as practical.
7. 
Verify you have the right size boiler before starting 
installation. See rating and capacity table.
8. 
When installed in utility room, door should be wide 
enough to allow largest boiler part to enter, or to 
permit replacement of another appliance such as water 
heater.
9. 
Boiler installed in building under construction, take 
care to insure clean combustion air supply during 
construction process. Airborne particulates such as 
from drywall dust and from fi berglass insulation can 
clog burner ports and cause incomplete combustion and 
sooting. 
NOTICE
Follow local regulations with respect to installation 
of CO detectors. 
Table 2  - BOILER MINIMUM CLEARANCE TO 
COMBUSTIBLES
Unit
Minimum 
Clearances
Top
6” (152mm)
Rear
6” (152mm)
Control Side
8” (203mm)
Opposite Side
6” (152mm)
Front (Alcove)
18” (457mm)
Flue/Vent Connector
6” (152mm)
Near Boiler Piping
1/2” (13mm)
Set unit on concrete or other noncombustible material base or 
fl oor. DO NOT INSTALL ON CARPETING.
Figure 1  - Minimum Clearances To Combustible 
Construction
10. 
FOR INSTALLATION ON NON-COMBUSTIBLE 
FLOORS ONLY - For installation on combustible 
fl ooring special base must be used. (See Replacement 
Parts Section.) Do Not Install Boiler on carpeting. 
11. 
Verify boiler is supplied with correct type of gas, fresh 
air for combustion, and suitable electrical supply.
WARNING
Fire hazard. Do not install boiler on combustible 
fl ooring or carpeting. Failure to follow these 
instructions could result in death or serious injury.
!
   
8”
Boiler
Rear
Front
Control Side
Opposite Side
18”
6”
6”
8”