SPX Cooling Technologies 800 用户手册

下载
页码 28
     
Initial Starting Procedure
1— Fill the cold water basin and circulating water system to a level 1/2”  
(13 mm) below the overflow. 
2— Bypass valve should be closed unless start-up is in cold weather. (See 
Routine Starting Procedure on page 8.)
3— Prime and start the circulating water pumps one at a time. Increase the 
flow of circulating water gradually to design water rate to avoid surges 
or water hammer which could damage the distribution piping. 
4— When  flow  has  stabilized  at  or  near  the  design  rate,  adjust  water 
make-up to maintain the level that the water has pumped down to 
in the cold water basin. (See 
Cold Water Collection Basin on page 
10.) This should coincide reasonably with the recommended operating 
water level indicated on the Marley project drawings.
5— Start the fan(s). After 30 minutes operating time, to permit Geareducer 
oil to come up to operating temperature, check
 motor load with watt 
meter, or take operating volt and ampere readings and calculate motor 
horsepower. Refer to Marley 
Fan Service Manual for instructions.  
If it is necessary to adjust fan pitch to pull correct contract horse-
power, measure results when circulating design water rate at design 
hot water temperature. Horsepower will change with air density. Lock 
out all electrical service before entering fan area.
 
 Caution