Lucent Technologies Release 6 用户手册

下载
页码 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Test the System 
Page 4-11
Test Expansion Interface Exchange for Each EPN 
4
Test Expansion Interface Exchange for 
Each EPN
Critical reliability only.
1. Verify the screen displays: 
Command:
2. Enter status cabinet 1-44>  and press 
Enter
. This displays the standby 
expansion link (before changes are made). See 
Screen 4-9
.
Screen 4-9.
Example of System Status Before Expansion Link is Set
3. Type set expansion-link xxxx
 
(where xxxx is the either 1 of the cabinet, 
carrier, and port locations of the standby expansion link).
4. Verify the screen displays:
Command successfully completed
Command:
5. Enter status cabinet 1-44 and press 
Enter
. See 
Screen 4-10
.
Screen 4-10.
Example of System Status after Expansion Link is Set
 status system all-cabinets 
                            SYSTEM STATUS CABINET 1
 EMERGENCY     SELECT                    SERVICE              CABINET
 TRANSFER      SWITCH      EXP-LINK      STATE     MODE       TYPE
 1A            unavail     01A01-02A01    in       standby    MCC
 1B            auto-on     01B01-02B02    in       active
                                -
                                -
 Command successfully completed
 Command:
status system all-cabinets 
                            SYSTEM STATUS CABINET 1
 EMERGENCY     SELECT                    SERVICE              CABINET
 TRANSFER      SWITCH      EXP-LINK      STATE     MODE       TYPE
 1A            auto-on     01A01-02A01    in       active     MCC
 1B            auto-on     01B01-02B02    in       standby