Bunn SNG0033000 用户手册

下载
页码 38
Page 37
SERVICE TOOLS (cont.)
NOTE: The tank heater will automatically turn off if 
left on too long.
26.  After testing the tank heater, press NEXT to advance 
to the next test.
27. The HEATER CONTACTOR is used only on certain 
models. Check the machine schematic to see if the 
contactor is present. Connect a voltmeter across a 
tank heater that is operated by the contactor and 
press ON to check that correct voltage is present. 
Press OFF and confirm the voltage is zero.
28. Press NEXT to return to TEST OUTPUTS.
29. To exit SERVICE TOOLS, press and release the 
ON/OFF switch (either on DUAL brewers) located 
on the front switch panel. This will return to the 
MAIN SCREEN.
Procedure to test switches:
 
This function allows the operator to test the opera-
tion of the individual switches on the front panel.
1.  Place brew funnel(s) into rails on the brewer (both 
sides on DUAL brewers).
2.  Place a Soft Heat server(s) beneath the brew 
funnel(s).
3.  Press and hold the upper right hidden switch until 
display reads UNITS. Release the switch. Continue 
to press and release switch until SERVICE TOOLS 
appears. 
4. Press YES to run tests on various components 
and outputs within the brewer. (Pressing NO will 
exit this function and advance to the next function 
screen.) 
5.  The display should read TEST OUTPUTS.
6. In 
TEST OUTPUTS screen, press NO.  This advances 
to TEST SWITCHES.
7. Pressing NO in this screen will advance to the  
next function. Press YES in the TEST SWITCHES 
screen to test the switches. The display will read 
NOTHING PRESSED.
8.  From this screen, press any of the switches on the 
front of the brewer except the upper right hidden 
switch.  While the switch is pressed, the display 
shows the name of that switch.  If the name does 
not appear, or if it remains after the switch has been 
released, the switch is defective.  Each switch can 
be tested in this manner. 
9.  After all switches have been tested, press and re-
PROGRAMMING THE BREWER (cont.)
lease the right hidden switch (®). This will return 
to TEST SWITCHES?. Press and release switch 
again to advance to TEST SERVERS?. Another 
alternative is to press and release the ON/OFF 
switch (either on DUAL brewers) located on the 
front switch panel. This will exit TEST SWITCHES 
and return to the MAIN SCREEN.
Procedures to test servers: 
 
This function allows the operator to test the opera-
tion of the Soft Heat servers. It will also show if the 
server is correctly placed on the brewer stand.
1.  Place brew funnel(s) into rails on the brewer (both 
sides on DUAL brewers).
2.  Place a Soft Heat server(s) beneath the brew 
funnel(s).
3.  Press and hold the upper right hidden switch until 
the display reads UNITS. Release the switch. Con-
tinue to press and release switch until SERVICE 
TOOLS? appears. 
4. Pressing NO  will exit this function and advance to 
the next function screen. Press YES to run tests 
on various components and outputs within the 
brewer.
5.  The display should read TEST OUTPUTS?
6. In TEST OUTPUTS screen, press NO. This ad-
vances to TEST SWITCHES?. Press and release 
NO once more. The display should now read TEST 
SERVER(S)?
7. Press YES in the TEST SERVER(S) screen to show 
if a server is in place. The display should read IN 
PLACE (with arrows pointing to the left and right 
on DUAL brewers).
8.  Lift and pull both Soft Heat servers forward about 
2 inches so that the two contacts on each server 
do not touch the two contacts on the brewer.
9.  The display should then read SERVER REMOVED 
(with arrows pointing to the left and right on DUAL 
brewers).
10. After the server(s) have been tested, press and re-
lease the ON/OFF switch (either on DUAL brewers)  
located on the front switch panel. This will exit TEST 
SERVERS  and return to the MAIN SCREEN.
Procedures to test coil frequency:
1.  Place brew funnels into rails on both sides of 
brewer.
2.  Place a Soft Heat server beneath each brew fun-
nel.
41341 080108