Quantum acl 4 安装指导

下载
页码 68
 Chapter 1 Installation Requirements
Site Requirements
ACL 4/52 Facilities Planning and Installation Guide
Site Requirements
1
This section describes the following installation site requirements for 
the library:
Floor space
Floor clearance
Floor inclination
Floor strength
Power
Grounding
Floor Space
1
Figure 4  Floor Space 
Requirements
Floor Clearance
1
The cabinet has a nominal floor clearance of 0.75 inch (1.9 cm). The 
library should be placed on a level, uncarpeted floor free of cracks, 
depressions, and so on. 
Floor Inclination
1
The floor in the installation site must be level to within 0.25 inch over a 
6 x 6 foot area.
31.12”
21.5”
Library
(Ramp Side/Off-load Area)
(For Maintenance Only)
(For Maintenance Only)
(M
aint
e
nance Area)
25”
25”
72”
25”
128”
71”
Front of Library
V
ent
ilati
on and
C
a
b
ling