Cisco Systems WS-X6608-T1 用户手册

下载
页码 128
C H A P T E R
3-1
Cisco Cat alyst 4900M Sw itch Instal lation Guid e
78-18350-02
3
Installing the Switch
Revis ed: January 4,  2012
This chapter describ es h ow to install the Catalyst  490 0M switch. For first-time  installations, perform the 
pro cedures in the following section s in the ord er lis ted.
  •
  •
  •
  •
  •
  •
Note
Before starting the installation proced ures in this chapter, complete the site plannin g checklist in  
 to verify that all plan ning activities were completed .
Checking the Contents
Note
Do n ot discard the shipping  con tainer when you  unpack  the switch . Flatten th e ship ping cartons and sto re 
them. You  will n eed the container if yo u n eed to move or ship the switch in the future.
To check the co nten ts  of the ship ping container follow th ese step s:
Step 1
Check the con tents of the accessories kit ag ainst the packing  slip . Verify that y ou received all listed  
eq uipment, which  sh ould include th e fo llowing: 
  •
Switch h ardware an d software do cumentation, if ord ered
  •
Optio nal equipment that yo u ordered, such as network interface cab les, transceivers, or sp ecial 
co nnectors. A console  cable is  not  prov ided  as part of th e  accesso ry  kit. It can  ordered  as  an  optio n.
Step 2
To begin installatio n, proceed to the