GE 82-POE 用户手册

下载
页码 226
 
Chapter 2: Installation 
GE-DS-82 and 82-PoE Ethernet Managed Switch User Manual 
17 
NOTE: 
Connection to the Managed Switch requires UTP Category 5 network cabling 
with RJ-45 tips.  Refer to the Cabling Specification in Appendix A for further 
information. 
Step 4: Connect the Managed Switch to network devices. 
A. Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports 
on the front of the Managed Switch. 
B. Connect the other end of the cable to the network devices (printer servers, 
workstations, routers etc). 
Step 5: 
Supply power to the Managed Switch
A. Connect socket end of the power cable to the socket on the Managed Switch 
rear panel. 
B. Connect the power cable plug to a standard wall outlet. 
C. Switch the power switch on the rear panel to ON. When the Managed Switch 
receives power, the Power LED should light and remain solid Green. 
Rack-mount Installation 
Use the following instructions to install the Managed Switch in a 19-inch standard 
rack. 
Step 1: Place the Managed Switch on a hard flat surface, with the front panel 
positioned towards the front. 
CAUTION: 
Use only the screws supplied with the mounting brackets. Damage caused 
by using incorrect screws will invalidate the warranty. 
Step 2: Attach the rack-mount bracket to each side of the Managed Switch.  Use the 
supplied screws attached to the package. Figure 6 shows how to attach brackets to 
one side of the Managed Switch. 
Figure 6:  Attaching rack-mount brackets to the GE-DS-82 
 
Step 3: Secure the brackets tightly, but do not over tighten screws.