Teledyne 200AH 用户手册

下载
页码 196
Teledyne API Model 200AH NO
X
 Analyzer Instruction Manual,  06492, Rev. G2 
 
7-13 
Table 7-11:  Calibration Quality Check 
Step 
Number 
Action 
Comment 
1. 
Scroll the TEST function 
menu until the NO
X
 
SLOPE is displayed. 
The SLOPE value for NO
X
 should be 1.0 
 0.3. If the value is 
not in this range, check Section 9.1.6. If the SLOPE value is 
in the acceptable range the instrument will perform optimally.
2. 
Scroll the TEST function 
menu until the NO
X
 
OFFSET is displayed. 
This number should be near zero. A value of 0.0 
50 
indicates calibration in the optimal range. This number 
already has the AutoZero value subtracted out and is mainly 
the background signal due to the molybdenum converter. If 
the OFFSET value is outside this range, check Section 9.1.6. 
3. 
Scroll the TEST function 
menu until the NO 
SLOPE is displayed. 
The SLOPE value for NO should be 1.0 
 0.3. If the SLOPE 
is in the acceptable range the instrument will perform 
optimally. If the value is not in this range, check 
Section 9.1.6.  
 
NOTE:  The NO and NO
X
 slopes should be equal within 
 0.1.
 
4. 
Scroll the TEST function 
menu until the NO 
OFFSET is displayed. 
The instrument will now display the NO OFFSET value. It 
should also have a value near zero (0.0 
 50). This number 
already has the AutoZero reading subtracted out and should 
be near zero. If the OFFSET value is outside this range, check 
Section 9.1.6. 
 
7.11. 
  Converter Efficiency Compensation 
The converter efficiency factor compensates NO
2
 readings for converter efficiency. The NO
2
 
component of the NO
X
 reading is also compensated when instrument is in switching mode. An 
efficiency factor of 1.0 disables efficiency compensation, acceptable values are .80 to 1.20. 
There are some fault conditions that can be revealed by a NO
2
 channel linearity check, such as a 
faulty switching valve or a partially plugged converter. For the converter to operate properly 
there should be at least a few percent oxygen present in the sample stream. 
There are 2 ways to enter the NO
2
 converter efficiency.  
Method 1 is covered in Table 7-12.