Emerson NGA2000 TO2 Benutzerhandbuch

Seite von 48
Instruction Manual 
748374-F 
March 2003 
Rosemount Analytical Inc.    A Division of Emerson Process Management 
Installation            2-1 
Model NGA2000 TO2 
SECTION 2 
INSTALLATION 
2-1 UNPACKING 
If the Trace Oxygen (TO2) Analyzer Module is 
received as a separate unit, carefully examine 
the shipping carton and contents for signs of 
damage. Immediately notify the shipping carrier 
if the carton or contents is damaged. Retain the 
carton and packing material until all components 
associated with the TO2 Analyzer Module are 
operational. 
2-2 ASSEMBLY 
Before installation of the TO2 Analyzer Module, 
electrolyte must be added to the Sensor.  Follow 
the procedure described below under Section 2-
2a below.   
After addition of electrolyte, locate the analyzer 
module on an appropriate mounting surface and 
connect the network cable to either the NET-
WORK 1 or NETWORK 2 connection on the 
Analyzer Module, and the NETWORK connec-
tion on the Platform network I/O port. (See 
Figure 2-1 on page 2-2 and Figure 2-4 on page 
2-5.) 
a. Electrolyte 
Addition 
Before adding electrolyte to the Sensor, it is 
recommended to check the Sensor for pos-
sible leakage caused by damage in ship-
ment.  To check the Sensor for leakage, 
remove the top cover of the Analyzer Mod-
ule and locate and remove the 5 mounting 
screws which hold the Sensor Assembly 
(Sensor, flow meter, plumbing, inlet/outlet 
fittings) to the module (see Figure 4-1 on 
page 4-1).  Be careful not to lose these 
screws as they have metric threads.  Care-
fully lift out the Sensor assembly and re-
move from the analyzer module.  Place on a 
flat surface and remove the black Sensor 
cover by unscrewing counterclockwise. 
Add distilled or deionized water to the Sen-
sor to the maximum level indication on the 
Sensor reservoir.  Let Sensor stand for ap-
proximately 15 minutes and check for leaks 
around the base of the reservoir, and at the 
seams and corners.  If a leak is found, con-
tact the factory before proceeding.  Drain 
the Sensor. 
Fill the Sensor with one bottle of electrolyte 
supplied with the analyzer module.  Use the 
entire contents of the bottle. 
NOTE: 
Do not add water.  The volume and con-
centration of the bottled electrolyte is 
pre-measured. 
Reinstall the black Sensor cover and care-
fully reinstall the Sensor Assembly inside 
the Analyzer Module.  Do not the tilt the 
Sensor Assembly excessively as electrolyte 
may leak out. 
2-3 LOCATION 
(See Figure 2-2 on page 2-3)  The TO2 Ana-
lyzer Module comes standard with mounting 
ears for easy installation on flat, horizontal sur-
faces. ,   Install the TO2 Analyzer Module in a 
clean, weather-proofed, vibration-free location 
free from extreme temperature variations and 
moisture. For best results, install the instrument 
near the sample stream to minimize sample 
transport time. 
, Operating ambient temperature is 0 
°C to 45 
°C (32 °F to 81 °F). Temperature change should 
not exceed 10 
°C (18 °F) per hour. The same 
temperature restrictions apply to the location of 
the zero and span gas cylinders. 
2-4 GASES 
a. Requirements 
The TO2 Analyzer Module requires only a 
standard of accurately known composition 
for use as a span gas.  The span gas 
should be supplied from a cylinder equipped