Honeywell PUB1012S Benutzerhandbuch

Seite von 24
SPYDER® BACNET® PROGRAMMABLE CONTROLLERS
9
63-2689—05
on page 6. The earth ground terminal (terminal 3) 
must be connected to a verified earth ground for 
each controller in the group (see Fig. 12 on 
page 9).
All loads on the controller must be powered by the 
same transformer that powers the controller itself. 
A controller can use separate transformers for 
controller power and output power.
Keep the earth ground connection (terminal 3) wire 
run as short as possible.
Do not connect the universal input COM terminals, 
analog output COM terminals or the digital input/
output COM terminals to earth ground. Refer to 
Fig. 16–Fig. 21 beginning on page 13 for wiring 
examples.
The 24 Vac power from an energy limited Class II power 
source must be provided to the controller. To conform to Class 
II restrictions (U.S. only), the transformer must not be larger 
than 100 VA. 
Fig. 11 depicts a single controller using one transformer.
IMPORTANT
Power must be off prior to connecting to or removing 
connections from the 24 Vac power (24 Vac/24 Vac 
COM), earth ground (EGND), and 20 Vdc power (20 
Vdc) terminals.
IMPORTANT
Use the heaviest gauge wire available, up to 14 AWG 
(2.0 sq mm), with a minimum of 18 AWG (1.0 sq mm), 
for all power and earth ground wiring.
Screw-type terminal blocks are designed to accept up 
to one 14 AWG (2.0 sq mm) conductor or up to two 18 
AWG (1.0 sq mm) conductors. More than two wires 
that are 18 AWG (2.0 sq mm) can be connected with 
a wire nut. Include a pigtail with this wire group and 
attach the pigtail to the terminal block.
IMPORTANT
Connect terminal 2, (the 24 Vac common [24 VAC 
COM] terminal) to earth ground (see Fig. 11).
NOTE: Unswitched 24 Vac power wiring can be run in the 
same conduit as the L
ON
W
ORKS
® cable.
Fig. 11. Power wiring details for one controller per 
transformer.
More than one controller can be powered by a single 
transformer. Fig. 12 shows power wiring details for multiple 
controllers.
NOTE: Controller configurations are not necessarily lim-
ited to three devices, but the total power draw, 
including accessories, cannot exceed 100 VA 
when powered by the same transformer (U.S. 
only). For power wiring recommendations, see 
Fig. 12. Power wiring details for two or more controllers per transformer. 
Communications
Each controller uses a BACnet MS/TP communications port. 
The controller’s data is presented to other controllers over a 
twisted-pair MS/TP network, which uses the EIA-485 signaling 
standard capable of the following baud rates: 9.6, 19.2, 38.4, 
76.8 or 115.2 kilobits per second (configured at global 
controller). The Spyder BACnet controllers are master devices 
on the MS/TP network. Each Spyder BACnet controller uses a 
high-quality EIA-485 transceiver and exerts 1/4 unit load on the 
MS/TP network.
M29684A
TRANSFORMER
OUTPUT
DEVICE
POWER
Δ
P
12345678
1
0
9
2345678 0
9
1
1 1111111 2
1
12345678 0
9
2
2 2222222 3
3
12345678 0
9
3
3
3
3
3
3
3
3 4
EARTH
GROUND
1
LINE VOLTAGE
GREATER
THAN 150 VAC
WHEN CONNECTIONG POWER TO THE SPYDER BACnet 
CONTROLLER, CONNECT THE COM LEG OF THE VAC SECONDARY 
CIRCUIT TO A KNOWN EARTH GROUND.
1
COM
24 VAC
CONNECT POWER TO 
TERMINALS 1 AND 2
M29685A
120/240
VAC
TRANSFORMER OUTPUT
DEVICE
POWER
Δ
P
12345678
1
0
9
2345678 0
9
1
1 1111111 2
1
12345678 0
9
2
2 2222222 3
3
12345678 0
9
3
3
3
3
3
3
3
3 4
COM
24 VAC
Δ
P
12345678
1
0
9
2345678 0
9
1
1 1111111 2
1
12345678 0
9
2
2 2222222 3
3
12345678 0
9
3
3
3
3
3
3
3
3 4
Δ
P
12345678
1
0
9
2345678 0
9
1
1 1111111 2
1
12345678 0
9
2
2 2222222 3
3
12345678 0
9
3
3
3
3
3
3
3
3 4
CONNECT POWER TO 
TERMINALS 1 AND 2
EARTH
GROUND