Enerco ERXL-175L Benutzerhandbuch

Seite von 28
17
Operating Instructions and Owner’s Manual
Enerco | enerRadiant® XL Series Heater
streams of combustion gases.
Outside Air Supply 
 
a)   See procedure and diagram on page ??.
FIGURE 12: Unvented Operation
36”
36”
A
1)  Ventilation equal to 4 CFM per 1,000 BTU/hr. firing 
rate must be provided in unvented heater installations.
2)  For dimensions A “unvented” refer to (Figure 1 — 
Minimum Clearances to Combustibles.)
FIGURE 13a: Single Wall
Single wall vent run
Single wall terminal end
FIGURE 13b: Double Wall
Double wall vent run and 
Double wall terminal end
FIGURE 14: Vertical Venting