Harman Stove Company XL Benutzerhandbuch

Seite von 34
Installation
Only For Qualified Installers
Door Latches
Remove  door  by  pulling  latches  out  as  shown  and 
pulling the bottom of the door out from the unit about 
3”. Then lift the door slightly up and off the hooks. 
Door Hooks
1
Remove air plate by lifting it up about 3 inches and 
then out of firebox. Be careful not to damage side 
brick panels
Converting to Natural Gas
The pilot must be placed in accordance with the above 
sketch for proper burner ignition. 
Pilot
Burner
2
3
4
Remove  log.  Next,  remove  screw,  washer  and 
spacer from the center of the rear brick panel. Using 
one hand, gently push the side brick/relief door open 
slightly and using the other pull the top of the rear 
brick panel forward and remove it.
Remove the screws mounting the intake air deflector and 
lift it from the firebox. Next locate the screw holding the 
burner tube to the firebox floor and remove it. Now the #50 
LPG burner orifice can be removed using a 1/2” deep well 
socket and replaced with a # 31 natural gas orifice.
Remove  screw  holding  pilot  air  deflectors,  and  the 
deflectors, to allow access to the pilot tower. using a 7/16” 
wrench,  take  out  the  LP  orifice  and  replace  it  with  the 
natural  gas  orifice.  Reassemble  components  adjusting 
pilot  air  deflectors  allowing  burner  tube  to  slide  over 
them and into place. Pilot orfices are marked NG and LP 
appropriately. 
15