Desa SPC-54PHW Benutzerhandbuch

Seite von 12
www.desatech.com
114144-01A
7
ASSEMBLY INSTRUCTIONS
Continued
Figure 8 - Attaching Dome to Emitter
OPERATING 
INSTRUCTIONS
 WARNING: If you smell gas:
•  Shut  off  gas  to  the  appli-
ance.
•  Extinguish any open flames.
•  If odor continues, immediately 
call your gas supplier.
See safety warnings and precau-
tions starting on page 1 of this 
manual for more information. 
PREPARING FOR OPERATION
1.  Check heater for possible shipping damage. If 
any is found, immediately notify the factory.
2.  Follow all safety information. 
3.  Check and assure control knob is in the "OFF" 
position.
4.  Place propane/LP gas cylinder inside cylinder 
base. Securely connect regulator to propane/LP 
gas cylinder.
5.  Turn  cylinder  valve  on. Apply  a  soap  and 
water solution to connection at regulator and 
cylinder. Bubbles forming show a leak.
6.  In case of any leaks, turn off propane/LP cyl-
inder valve, undo leaking connection. Check 
and clean connection. Reconnect regulator and 
leak test again.
START
1.  Purge gas line leading to pilot assembly. Press 
and turn control knob to HIGH position, keep-
ing it pressed in for 1 to 2 minutes. Note: When 
a new or refilled gas cylinder is installed, heater 
will need to be purged again. 
2.  To light the pilot:
a) Press control knob and turn to the PILOT 
position.
b) Hold control knob in and press ignition 
button until the pilot lights.
c) Keep control knob depressed for 30 seconds 
to heat thermocouple.
d)  Release  control  knob  and  pilot  should 
remain lit. Note: To visually check igni-
tion of pilot, slide viewing hole cover to 
either side.
e) Once pilot flame stays on, close viewing 
hole cover.
DOME AND EMITTER
Gently lay heater assembly on its side using one of 
the shipping styrofoam inserts to prop up the top 
half of heater. Align holes in dome with threaded 
studs in emitter cover. Secure dome to emitter 
using three cap nuts. Tighten with an adjustable 
wrench. Stand heater back to upright position.