PRE-INSTALLATION INSPECTION OF EQUIPMENT 
All  units  are  factory  tested  to  ensure  safe  operation 
and quality assembly. Units are packaged and sealed 
on shipping skids and shipped in first class condition. 
Torn and broken packaging, scratched or dented panels 
should be reported to carrier immediately. An internal 
inspection  of  each  unit  should  be  performed  prior  to 
installation.  Remove  all  access  doors  and  check  for 
visual defects that can occur during transport. Any prob-
lems found internally should be reported to carrier and 
manufacturer immediately. Refrigerant circuit should be 
checked to ensure no leaks have occurred during ship-
ment. Install gauge set on high and low pressure ports 
to confirm pressure has been maintained and no leaks 
have  occurred  during  shipment.  Repair  any  damage 
prior to installation to ensure safe operation. 
Record any unit damage on the Bill of 
Lading and report to carrier and factory 
immediately.  Shipping  and  handling 
damages are not warranty items. 
RIGGING
Prior to mounting unit, check individual 
unit weights (pages 7-8) and verify lifting 
capacity  of  lifting  equipment  exceeds 
weight of units by safe margins. Failure 
to do so may result in unit damage, per-
sonal injury or even death. 
To ensure safe installation of the unit when ceiling mount 
application is specified, estimate the approximate center 
of gravity of the unit. The configuration of internal com-
ponents for each unit is different and weight is unevenly 
distributed. 
Determine the actual center of gravity of 
the unit by performing a test lift. Lifting 
an unbalanced unit can cause personal 
injury or even death. 
INSTALLATION 
Lock all electrical power supply switch-
es  in  the  off  position  before  installing 
the  unit.  Failure  to  disconnect  power 
supply may result in electrical shock or 
even death. 
Location - To ensure unit operates at maximum efficien-
cies, choose a dry indoor area where the temperature 
is controlled between 50 deg F and 115 deg F. Con-
sideration of surrounding areas should be taken when 
choosing a location to install the unit. Common vibration 
and sound levels associated with commercial equipment 
may be objectionable to people or equipment. 
Failure to allow adequate space between 
units  may  result  in  poor  unit  perfor-
mance and possible unit failure. 
Refer to typical installation diagram (Page #5). 
Install thermostats, air supplies and returns so that each 
unit will operate only on individual unit control. To assure 
fast drainage of condensate run-off, unit can be slightly 
pitched in the same direction as drain pan outlet.