   PVC Materials should use ASTM D-2564 Grade Cement; CPVC 
Materials  should  use  ASTM  F-493  Grade  Cement  and  ABS 
Materials should use ASTM D-2235 Grade Cement.
  If the water heater is being installed as a replacement for an 
existing power vented heater in pre-existing venting, a thorough 
inspection of existing venting system must be performed prior 
to any installation work. Verify that correct material as detailed 
above has been used, and that the minimum or maximum vent 
lengths and terminal location as detailed in this manual have been 
met. Carefully inspect the entire venting system for any signs of 
cracks or fractures, particularly at  joints between elbows and 
other fittings and straight runs of vent pipe. Check system for signs 
of sagging or other stresses in joints as a result of misalignment 
of any components in the system. If any of these conditions are 
found, they must be corrected in accordance with the venting 
instructions  in  this  manual  before  completing  installation  and 
putting the water heater into service.
  note:  For  water  heaters  in  locations  with  high  ambient 
temperatures (above 100°F) it is recommended that CPVC or 
ABS pipe and fittings be used.
4. All  vent  (exhaust)  pipes  must  be  pitched  a  minimum  of  a 
1/4”  per  foot  back  to  the  water  heater  to  allow  drainage  of 
condensation.
InstallatIon of vent sYsteM
Before beginning installation of piping system thoroughly read the 
section of this manual VENT PIPE PREPARATION.
If  you  are  installing  your  system  so  that  it  vents  through  roof, 
please refer to section  titled INSTALLATION OF VERTICAL VENT 
SYSTEM.
vent terMInal InstallatIon, sIdewall
1.  Install the vent terminal by using the cover plate as a template 
to  mark  the  hole  for  the  vent  pipe  to  pass  through  the  wall.  
BEWARE OF CONCEALED WIRING AND PIPING INSIDE THE 
WALL.
2.  If the Vent Terminal is being installed on the outside of a finished 
wall, it may be easier to mark both the inside and outside wall.  
Align  the  holes  by  drilling  a  hole  through  the  center  of  the 
template from the inside through to the outside. The template 
can now be positioned on the outside wall using the drilled hole 
as a centering point for the template.
3.  A)  MASONRY SIDE WALLS
  Chisel an opening approximately one half inch (1.3 cm) larger 
than the marked circle.
 
  B)  WOODEN SIDE WALLS
  Drill a pilot  hole approximately one quarter inch (0.64 cm) outside 
of the marked circle. This pilot hole is used as a starting point 
for a saws-all or sabre saw blade. Cut around the marked circle 
staying approximately one quarter inch (0.64 cm) outside of the 
line. (This will allow the vent to easily slide through the opening. 
The resulting gap will be covered up by the Vent Terminal cover 
plate.) Repeat this step on inside wall if necessary.