Servis-Rhino 1480 Benutzerhandbuch

Seite von 104
OPERATION
1480/1485/1495   01/11
Operation Section 4-25
© 2011 Alamo Group Inc.
OPERA
T
ION
Lift and roll back of bucket will increase efficiency
because....
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE: Do not be concerned if the bucket is not
completely filled during each pass. Maximum
productivity is determined by the amount of
material loaded in a given period of time. Time is
lost if two or more attempts are made to fill the
bucket on each pass.