3.2.4  Lamp Monitor Unit Connections 
 
NOTE.RED LAMP MONITORING is not approved by the Department of 
Transport and should not be used. 
 
If the installation uses the lamp monitoring facility then Current 
monitoring transformers are connected to PL1 on the OTU PC
co
a
 curren
monitor transformers have two wires each, terminated in crimps that push in to the 
co
 
N
tio
ing. Positions 1
53 and 
54 are unused
of the 50 pins on plug PL1. 
 
Figure 28 shows the p
MU input 1- (PL1 pins 1 
an
 
4
input + and ZXO input - (PL1 pins 49 and 50), correspond to positions 51 and 52 
spectively on the 54 way housing. 
Note - LMU Input 24 (pins 47 and 48) is internally connected to the ZXO input 
 therefore 
connect to either LMU input 24 or the ZXO input. Whichever input is used, 
the other input must not be used for anything else. Under the voltage 
monitoring transformer heading, later in this section the description 
explains how to connect to the ZXO input; if this is used LMU input 24 
must be left unconnected. 
 
and voltage 
B via a 54-way 
nnector housing (p rt number 508/4/26138/004). The
t and voltage 
nnector housing.  
ote - only 50 posi
ns are used on the 54 way hous
, as they do not line up with any 
, 2, 
in out of PL1. LMU input 1+ and L
d 2), correspond to positions 3 and 4 respectively on the 5  way housing. ZXO 
re
 
(pins 49 and 50). The voltage monitoring transformer can
 
50 
49 
End Connector Socket Positions not used 
Polarising Pip 
Connector Viewed from the BACK 
 
 
Figure 28 - LMU Input Connector 