Troy-Bilt 340 Benutzerhandbuch

Seite von 36
Assembly & Set-Up
3
7
Assembly
References to the right and left side of tiller are determined from 
behind the equipment in the operating position.
Recommended Tools for Assembly
• 
One 1⁄2” open-end wrench
• 
One 3⁄8” open-end wrench
• 
Clean oil funnel
• 
Motor oil. Refer to the Engine Operator’s Manual for oil 
specifications and quantity required.
Handle
1. 
Identify the forward clutch cable. Fig. 3–1. 
Forward Clutch Cable
Figure 3-1
NOTE: Be sure not to kink cables while attaching.
2. 
Hook the “Z” end of the forward clutch cable into the tine 
engagement lever Fig. 3–2.
Figure 3-2
3. 
Remove the hex screw and bell washer from the right side 
of the frame. Hold the cable guide bracket on the left side of 
frame as it will fall when the bolt is removed. Step 1 in Fig. 3–3.
2
1
3
Hex Screw
Hex Screw
Bell Washer
Bell Washer
Cable Guide
Bracket
Handle
Figure 3-3
 
4. 
Insert the handle into tiller frame as shown. Step 2 in Fig. 3–3.
5. 
Insert the bolt through the cupped washer, frame, handle 
and into the cable guide bracket (note the notch in the 
cable guide bracket goes over the flange on the frame.) 
Step 3 in Fig. 3–3. 
Contents of Carton
• 
One Tiller 
• 
One Handlebar Assembly
• 
One Depth Gage Assembly
• 
One Operator’s Manual
• 
One Engine Operator’s Manual