Siemens 2000592-001 Benutzerhandbuch

Seite von 72
DataNET Copper Connections 
 
Before You Begin 
This section provides instructions for connecting the Maxum to a 
DataNET network. All DataNET connections are made to the ANCB. The 
DataNET connections can be either copper or fiber. 
The ingress wiring method (conduit or cable glands) and which cable 
type you use is dependent upon the site requirements. Review the Site 
Wiring Requirements page 8 to ensure that you are using the correct 
cable and wiring method.  
Refer to ANCB Description page 46. 
J12
J4
10B ase2
10B aseT
J 10 P ort 1
For ANCB: Ju mpers on
Botto m  3 Po sition s O n ly
J11 Port 2
For ANCB  Ju mp ers on
Botto m  3 po sition s O n ly
Config Port
RS232
57.6 KB
J2 Ju m p er Co nn ection s
     150  Ohm
     120 Ohm     Port 2 (DN)
 
    100 Ohm
    150  Ohm
     120 Ohm     Port 1(DN)
•   •  100 Ohm
Default S etting  on 150 o hm
Position s
Board
RESET
O peration   LED S
J5
Default on Pins 1 &2
 
Figure 1-1: ANCB Board 
Jumper Settings 
NAU Installations 
For rack mount units the SYSCON connections are visible at the rear of 
the NAU. If you have a wall mounted unit you must first remove the front 
or side safety box access covers to see the SYSCON connections. 
 
Instructions 
Step Action 
1.   
Turn off AC Power (Mains) to the unit. 
 
2.   
Route incoming the DataNET copper cables to the ANCB 
in accordance with national or local electrical codes and 
regulations.  
14  
  Installation 
2000592-001