Table 14: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
Plan rack location, including required space
clearances.
If a rack is used, secure rack to floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
Rack Requirements
The router must be installed in a rack. Many types of racks are acceptable, including
4-post (telco) racks and open–frame racks. An example of a open-frame rack appears
in 
.
The following sections describe rack requirements:
Rack Size and Strength
The router is designed for installation in a 19-in. rack as defined in Cabinets, Racks,
Panels, and Associated Equipment
 (document number EIA-310-D) published by the
Electronics Industry Association (
http://www.eia.org
).
With the use of adapters, the router is designed to fit into a 600-mm-wide and
600-mm-deep rack as defined in the four-part Equipment Engineering (EE); European
telecommunications standard for equipment practice
 (document numbers ETS 300
119-1 through 119-4) published by the European Telecommunications Standards
Institute (
http://www.etsi.org
). Use approved wing devices to narrow the opening
between the rails.
42
Rack Requirements
M10i Internet Router Hardware Guide