6--3
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM
164201373 Rev. A
092402
4.
Connect the SCM wiring to the terminal block using the terminations shown in
Table 6---1.
Table 6---1. Supervisory Contact Module Wire Terminations
From SCM A
To SSBM
Remarks
TB1---4
TB3---1
TB1---5
TB3---2
TWISTED WIRES (4)
1 2 TURNS PER
TB1---6
TB3---3
1---2 TURNS PER
3 INCHES
TB1---7
TB3---4
From SCM B (if used)
To SSBM
Remarks
TB1---4
TB3---5
TB1---5
TB3---6
TWISTED WIRES (4)
1 2 TURNS PER
TB1---6
TB3---7
1---2 TURNS PER
3 INCHES
TB1---7
TB3---8
5.
Contact your local field service office for verification and testing of the SCM
and its connections prior to making connections to terminal strip TB2 shown
in Figures 6---1 and 6---3.
6.
Repeat steps 1 through 5 for each SCM you are installing.
7.
If you are installing an RMP or RIM in addition to an SCM, proceed to
Chapter 4 or 5, respectively; otherwise, secure the SSBM by reversing the
steps contained in procedure “To Prepare the SSBM for Wiring to an RMP,
RIM, SCM, or Remote EPO” of Chapter 2.