Provisioning guidelines 3-23
Step 11:
Provision
loops
Tone and Digit Switch
and Conference
loops are
provisioned according to the two-year figure for the number of network
loops required. All systems should be equipped with a minimum of two
TDS and two CONF loops.
loops required. All systems should be equipped with a minimum of two
TDS and two CONF loops.
Refer to Table 10 (at the end of this document) to determine TDS and
CONF loop requirements for systems other than SL-1 S. Enter these figures
on Worksheet F (at the end of this document).
CONF loop requirements for systems other than SL-1 S. Enter these figures
on Worksheet F (at the end of this document).
Refer to the end of this document and use Worksheets G through
calculate memory needs. The two-year figure for sets, consoles, trunks, for
example, should be used when calculating. Once the total memory needs
are determined, add an additional 10% to the total.
example, should be used when calculating. Once the total memory needs
are determined, add an additional 10% to the total.
Step 13:
the equipment prepare equipment
summary
Equipment summary
Use Worksheet J (at the end of this document) to record the equipment
requirements for the complete system at cutover. Proceed to assign
equipment. The equipment summary may have to be updated as a result of
assigning procedures. The equipment summary, once finalized, may be
used to order the equipment for the system.
requirements for the complete system at cutover. Proceed to assign
equipment. The equipment summary may have to be updated as a result of
assigning procedures. The equipment summary, once finalized, may be
used to order the equipment for the system.
System engineering 553-3001-l 51