Zephyr Z1C-01LL Benutzerhandbuch

Seite von 12
www.zephyronline.com
  MOUNTING THE DUCT COVER
1. Remove the (2) screws to unlock 
the top support frame from the 
bottom support frame. Fig.1. 
 
Adjust the height by referring to 
the diagram in Fig. 2.  Secure the 
support frames together with (2) 
screws per extension arm (Tot. 8). 
Fig.3
2. Place correct size ducting for your 
installation (not supplied) on top 
of hood and secure to the blower 
collar with aluminum duct tape. 
The ducting should be long enou-
gh so it protrudes out the top of 
the support frame and extends 
into the attic to connect after the 
hood is installed. Fig.4
3.  Place assembled support frames 
on top of hood and secure it to the 
hood body using 8 screws. Fig.5
4. Place duct covers over assembled 
support frame until they rest on 
the hood body. Fig.6
5. Position hole template on the ceiling 
paying attention that the arrow is po-
sitioned on the same side as the range 
hood controls. Fig.7
Installa
tion - Moun
ting the Duc
t C
o
v
e
r
X
B
C
4,3 - 1/16"
24"
X = C - (4,3-1/16" + 24" + B)
- 4 -