Zephyr Z1C-01LL Benutzerhandbuch

Seite von 12
Installa
tion - Moun
ting the Duc
t C
o
v
e
r
- Make 4, holes in the ceiling and drive in 
(3) screws without completely tighte-
ning them. Pay attention not to insert 
the screw into the hole marked with 
an X  on the hole template  Fig.7
6. Lift the hood assembly to the cei-
ling and align the top support fra-
me with the (3) screws previously 
installed in the ceiling.
- Rotate assembly slightly clockwise 
to lock in place. Fig.8A. Drive in 
the fourth screw and tighten the 
remaining 3 screws to secure the 
structure in place.  Fig.8B
7.  Extend the upper duct cover and secure it to the 
top support frame by using (2) screws. Fig.9
8. Verify that ducting from hood is connected to 
ducting in the attic that will exhaust air out of 
the home.
- 5 -