Precor P30 Console Benutzerhandbuch

Seite von 104
Installing the Console 
33
 
 
 
Completing the Console Installation (P30 
and P20) 
Before you complete the final installation steps, double-check 
the connections you have made. Make sure that all cables are 
fully and securely connected, and that any unneeded cables 
are tied back properly. 
To complete the installation: 
1.
  Feed extra cable back into the neck tube. 
2.
  Tilt the control console backward (toward yourself) until 
the tab on the top edge of its back plate slides along the 
top edge of the console mount and the screw holes align 
properly. 
3.
  Insert the four ⁵₈-inch flat head screws through the holes 
in the console mount and thread them into the holes in 
the back plate on the console. Partially tighten the screws 
using a ⁵₈-inch hex wrench. 
4.
  Line up the two small tabs at the bottom of the console’s 
back cover with the slots at the bottom of the console 
case. Insert the tabs into the slots. 
5.
  Insert the two #8–32 x ¹₂-inch Phillips-head screws that 
you removed earlier into the holes at the top edge of the 
console’s back cover. Tighten the screws fully. 
Important: Use caution not to pinch the cables between the 
back cover and PVS mounting screw heads. 
6.
  Fully tighten the four mounting screws (partially 
tightened in step 3) using a ⁵₃₂-inch hex wrench. 
 
Verifying That the Heart Rate Display Is 
Operational 
To verify that the heart rate display is operational: 
1.
  Begin exercising on the equipment. 
2.
  Grasp both touch-sensitive handlebars. 
Note: The heart rate is read within ten seconds. During 
that time, the heart on the display flashes. 
3.
  Look at the HEART RATE display. After a few seconds, a 
number appears indicating your heart rate. 
4.
  If a number does not appear in the HEART RATE display, 
check the cable connection to make sure it is properly 
connected.