Enterasys D2G124-12P Installationsanweisungen

Seite von 76
Mounting the Switch
2-10 Installation
Installing the Switch Under a Table
To install the switch in the table mount kit and then install it under a table, refer to 
 and 
proceed as follows:
Figure 2-9  Installing the Switch in the Table Mount Kit (shown with one D2-PWR supply)
1.
Ensure that you have appropriate screws for securing the assembled table mount kit to your 
table location. These four screws are required and are not provided in the table mount kit.
Caution: The table location and rack mounting screws/anchoring method that the installer selects 
for mounting the D2 switch must be capable of supporting 60 lbs (27.2kg).
Advertencia: La ubicación de la mesa y el método de anclaje o los tornillos de montaje del estante 
que el instalador seleccione para montar el interruptor D2 deberán ser capaces de soportar un peso 
de 60 lbs (27.2 kg).
1
Table mounting screw holes (four)
6
Serial number access window
2
Switch mounting screw holes (three)
7
Power supply (D2-PWR shown)
3
AC power receptacle
8
AC power cord
4
Power supply hook & loop strap
9
Hook & loop strap through power supply mounting 
holes 
5
DC power cord
10 Hook & loop strap through bridge anchor