Enterasys D2G124-12P Installationsanweisungen

Seite von 76
Installing the Optional Plastic Cover
Enterasys D-Series Hardware Installation Guide 2-33
Figure 2-26  Cable Connection (LC shown) to Uplink Port with SFP Installed 
3.
Plug the other end of the cable into the appropriate port on the other device. Some cables may 
be terminated at the other end with two separate connectors, one for each fiber‐optic strand. In 
this case, ensure that the transmit fiber‐optic strand from the D2 is connected to the receive 
port of the other device, and the receive fiber‐optic strand on the D2 is connected to the 
transmit port of the other device.
4.
Repeat this procedure for other SFP ports, if needed.
5.
If an SFP port is unused, install a dust cover.
Installing the Optional Plastic Cover
If you have purchased a D2‐COVER‐W optional plastic cover, you can install it over a freestanding 
or wall‐mounted switch as shown in 
1
Combo SFP port with MGBIC installed
LC cable connector
Release tab 
Note: The optional plastic cover can be installed over a freestanding unit or a unit mounted in a 
D2-WALL-MNT kit. It is not intended for use in a D2 lockbox.