Completing the Installation
Enterasys D-Series Hardware Installation Guide 2-35
3.
Using the four screws provided, attach the cover to the switch. Fasten securely.
Figure 2-28  Optional Kensington Lock Opening
4.
(Optional) Secure the switch and cover assembly with a Kensington lock using the optional 
knock‐out opening on the cover’s side panel, as shown in 
, and the corresponding 
slot on the D2 switch.
Completing the Installation
1.
Power on the switch.
2.
Verify that the PWR1 and PWR2 power LEDs are lit. Refer to “
page 2‐27 for information on interpreting the power LEDs.
3.
Verify that the CPU LED blinks initially then becomes solid green.
4.
Make sure that the network devices connected to the switch ports are powered on, then verify 
that each Link/Activity LED is ON (solid green or blinking green).
5.
At the device connected to the console port, perform the following:
a.
Enter admin for Username.
b. At the Password prompt, press ENTER (RETURN). 
1
Location of knock-out opening for optional Kensington lock
Note: The D2 fans turn on when power is first supplied to the switch and will shut off automatically. 
The fans will turn back on automatically if the temperature ever exceeds the following ambient 
thresholds:
• D2G124-12 - 40 degrees C (104 degrees F)
• D2G124-12P - 35 degrees C (95 degrees F)