Cisco Cisco ONS 15310-CL SONET Multiservice Platform Installationsanleitung

Seite von 16
 
2
Upgrading Cisco ONS 15310-CL to Release 6.0
OL-7109-01
  Before You Begin
Before You Begin
Before beginning, write down the following information about your site; the data will be useful during 
and after the upgrade: Date, Street Address, Site Phone Number, and Dial Up Number.
Caution
Read all procedures before you begin the upgrade.
Caution
This upgrade is supported only for Software Releases 5.x upgrading to Release 6.0. 
Document Procedures 
Procedures in this document are to be performed in consecutive order unless otherwise noted. In general, 
you are not done with a procedure until you have completed it for each node you are upgrading, and you 
are not done with the upgrade until you have completed each procedure that applies to your network. If 
you are new to upgrading the ONS 15310-CL, you might want to check off each procedure on your 
printed copy of this document as you complete it.
Each non-trouble procedure (NTP) is a list of steps designed to accomplish a specific procedure. Follow 
the steps until the procedure is complete. If you need more detailed instructions, refer to the detail-level 
procedure (DLP) specified in the procedure steps. Throughout this guide, NTPs are referred to as 
“procedures” and DLPs are termed “tasks.” Every reference to a procedure includes its NTP number, and 
every reference to a task includes its DLP number.
The DLP (task) supplies additional task details to support the NTP. The DLP lists numbered steps that 
lead you through completion of a task. Some steps require that equipment indications be checked for 
verification. When the proper response is not obtained, a trouble clearing reference is provided. This 
section lists the document procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
This section lists the document procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
—This section contains critical information 
and tasks that you must read and complete before beginning the upgrade process.
2.
—Complete the database backup to ensure that 
you have preserved your node and network provisioning in the event that you need to restore them.
3.
—You must complete this entire procedure before the 
upgrade is finished.
4.
—You must complete this procedure to be 
able to run ONS 15310-CL Software R6.0.
5.
Complete this procedure 
only if you need to return to the software load you were running before activating the Release 6.0 
software.