Naming of groups and zones is equally important as they will be directly
reflected in the report. A zone name of “Concourses” with group names of
“Main Hall” and “Section 101” make for easier reading within the report. This
also makes it possible to generate a useful proof of play report without
detailed knowledge of how the system is configured.
reflected in the report. A zone name of “Concourses” with group names of
“Main Hall” and “Section 101” make for easier reading within the report. This
also makes it possible to generate a useful proof of play report without
detailed knowledge of how the system is configured.
Using the Proof of Play Screen
The Setup > Proof of Play screen in the Control Panel displays the status of
the collection of data required to demonstrate proof of play. Each entry in the
window represents an event.
the collection of data required to demonstrate proof of play. Each entry in the
window represents an event.
The Proof of Play screen displays the event name, the start and end time of
the event, whether the event has finished, and whether the raw data was
converted to a CSV file. The status column shows the status of each entry. A
green dot displays in the status column when the report is ready to be
generated.
the event, whether the event has finished, and whether the raw data was
converted to a CSV file. The status column shows the status of each entry. A
green dot displays in the status column when the report is ready to be
generated.
You can download the proof of play data for a specific event by selecting
download under the CSV column. The CSV file will be downloaded to the
CSV repository on the SV Director server.
download under the CSV column. The CSV file will be downloaded to the
CSV repository on the SV Director server.
Figure 8.
Proof of Play Screen
Table 6 describes the column headings for the Proof of Play screen.
Table 6.
Proof of Play Screen Headings
Column Header
Description
Status
Script is currently running (orange box), script is completed and PoP data is
ready to be generated (green circle), PoP report is being generated (yellow
icon). PoP is complete (yellow icon).
ready to be generated (green circle), PoP report is being generated (yellow
icon). PoP is complete (yellow icon).
Script Name
Name of the Event Script as specified in StadiumVision Director. This is the
same for all entries in the CSV.
same for all entries in the CSV.
Script Run Date
Date and time the event script was started on the local server. This is the
same for all entries in a single CSV.
same for all entries in a single CSV.
Last Report Creation
Date the report was last generated.