Cisco Cisco StadiumVision Director Anleitung Für Quick Setup
Workflow Summary to Configure SV-4K and DMP-2K
Video Walls
Video Walls
configuring a video wall using SV-4K or DMP-2K media players.
Table 29. SV-4K and DMP-2K Video Wall Task Workflow
Step
Task
Guidelines
1
Determine the type of content that you
want to display on the video wall.
.
Most video walls can reliably use standard
DMP-to-DMP synchronization.
Video content of longer duration (15 minutes or
longer), will benefit most from zone-based
synchronization.
2
Determine your video wall
configuration.
Be sure that the layout is designed to
accommodate 1920x1080 screen formats. See
.
3
Configure groups/zones.
4
Create (or verify) templates.
All content (and for all TVs in a video wall zone)
must be deployed using the same template,
with the same number of regions and playlists.
5
Create content.
Consider the content changes for different
times over the course of the event.
.
6
Create playlists.
Create one playlist for each DMP/display in the
video wall.
196 of 331
© Cisco Systems, Inc. All rights reserved.