Hoyt compound-2002 Benutzerhandbuch

Seite von 30
11
mounting the cable guard bar, you must remove
the nylon screws used only for shipping purpos-
es. To insert the cable guard bar, simply slide the
bar through the two mounting holes on the riser
making sure that the bar is pushed completely
through and flush with the end of the front
mounting hole.  After the bar has been inserted
fasten with the 1/4-20 x 1/2” set screws provid-
ed.  (See fig 5)
Hoyt USA’s magnesium bows are designed with
a high mount style
cable guard bar that
is mounted directly
to the side of the
riser by two 10-24
screws.  (See fig
6)Prior to mounting
the cable guard bar,
you must remove the
nylon screws used
Screws 
Flush w/Front of Riser
10-24 SHCS
Screws
fig 5
fig 6