Wayne-Dalton 9700 Benutzerhandbuch
Tools Needed:
6
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages business listings or go to the
Find a Dealer section online at www.Wayne-Dalton.com
hEADROOM REquIREMENT
TRACk TyPE
MIN. hEADROOM
15” Radius track
13-1/2” (343 mm)
DOOR hEIghT
TRACk
MANuAl lIFT
MOTOR
OPERATED
6’6” - 7’0”
15” Radius 98” (2489 mm) 125” (3175 mm)
7’3” - 8’0”
15” Radius 110” ( 2794 mm) 137” ( 3480 mm)
WEaTHER sEal
bACkROOM REquIREMENT
HEaDROOM
BaCkROOM
DOOR
WIDTH
DOOR HEIgHT
lEVEl HEaDER
PluMB jaMBs
HEaDER BOaRD
2” x 6” luMBER
PREfERRED
suITaBlE MOuNTINg
suRfaCE 2” x 6”
luMBER MINIMuM
Recommended
tools from
page 5
HEaDER
jaMB
jaMB
Preparing the Opening
If you just removed your existing door or you are installing a new
door, complete all steps in PREPaRINg THE OPENINg.
To ensure secure mounting of track brackets, side and center
brackets, or steel angles to new or retro-fit construction, it is
recommended to follow the procedures outlined in DasMa Technical
Data sheets #156, #161 and #164 at www.dasma.com.
The inside perimeter of your garage door opening should be framed
with wood jamb and header material. The jambs and header must
be securely fastened to sound framing members. It is recommended
that 2” x 6” lumber be used. The jambs must be plumb and the
header level. The jambs should extend a minimum of 12” (305 mm)
above the top of the opening for TorqueMaster
®
counterbalance
systems. for low headroom applications, the jambs should extend
to the ceiling height. Minimum side clearance required, from the
opening to the wall, is 3-1/2” (89 mm).
IMPORTANT: ClOsEly INsPECT jaMBs, HEaDER aND
MOuNTINg suRfaCE. aNy WOOD fOuND NOT TO BE sOuND,
MusT BE REPlaCED.
for TorqueMaster
®
counterbalance systems, a suitable mounting
surface (2” x 6”) must be firmly attached to the wall, above the
header at the center of the opening.
NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid
splitting the lumber. Do not attach the mounting surface with nails.
Weather seal (May Not Be Included):
Cut the weather seal if necessary to fit the header and jambs.
For quick install track: align the header seal with the inside edge
of the header and temporarily secure it to the header with equally
spaced nails. Next, fit the jamb seals up tight against the header
seal and flush with the inside edge of the jamb. Temporarily secure
the jamb seals with equally spaced nails. This will keep the bottom
section from falling out of the opening during installation. Equally
space nails approximately 12” to 18” apart.
For fully adjustable track: align the header seal 1/8” to 1/4” inside
the header and temporarily secure it to the header with equally
spaced nails. Next, fit the jamb seals up tight against the header
seal and 1/8” to 1/4” inside the jamb. Temporarily secure the jamb
seals with equally spaced nails. This will keep the bottom section
from falling out of the opening during installation. Equally space nails
approximately 12” to 18” apart.
NOTE: Do not permanently attach weather seal to the jamb at this
time.
hEADROOM REquIREMENT: Headroom is defined as the space
needed above the top of the door for tracks, springs, etc. to allow the
door to open properly. If the door is to be motor operated, 2-1/2” (64
mm) of additional headroom is required.
bACkROOM REquIREMENT: Backroom is defined as the distance
needed from the opening back into the garage to allow the door to
open fully.
quICk INsTall TRaCk
fully aDjusTaBlE TRaCk
jaMB
jaMB
WEaTHER
sEal
WEaTHER
sEal
1/8” TO 1/4”