Wayne-Dalton 9700 Benutzerhandbuch

Seite von 32
Tools Needed:
6
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 
local yellow pages business listings or go to the 
Find a Dealer section online at www.Wayne-Dalton.com
hEADROOM REquIREMENT
TRACk TyPE
MIN. hEADROOM
 15” Radius track
13-1/2” (343 mm)
DOOR hEIghT
TRACk
MANuAl lIFT
MOTOR 
OPERATED
6’6” - 7’0”
15” Radius 98” (2489 mm) 125” (3175 mm)
7’3” - 8’0”
15” Radius 110” ( 2794 mm) 137” ( 3480 mm)
WEaTHER sEal
bACkROOM REquIREMENT
HEaDROOM
BaCkROOM
DOOR
WIDTH
DOOR HEIgHT
lEVEl HEaDER
PluMB jaMBs
HEaDER BOaRD 
2” x 6” luMBER 
PREfERRED
suITaBlE MOuNTINg 
suRfaCE 2” x 6” 
luMBER MINIMuM
Recommended 
tools from 
page 5
HEaDER
jaMB
jaMB
Preparing the Opening
If you just removed your existing door or you are installing a new 
door, complete all steps in PREPaRINg THE OPENINg. 
To ensure secure mounting of track brackets, side and center 
brackets, or steel angles to new or retro-fit construction, it is 
recommended to follow the procedures outlined in DasMa Technical 
Data sheets #156, #161 and #164 at www.dasma.com.
The inside perimeter of your garage door opening should be framed 
with wood jamb and header material. The jambs and header must 
be securely fastened to sound framing members. It is recommended 
that 2” x 6” lumber be used. The jambs must be plumb and the 
header level. The jambs should extend a minimum of 12” (305 mm) 
above the top of the opening for TorqueMaster
®
 counterbalance 
systems. for low headroom applications, the jambs should extend 
to the ceiling height. Minimum side clearance required, from the 
opening to the wall, is 3-1/2” (89 mm).
IMPORTANT: ClOsEly INsPECT jaMBs, HEaDER aND 
MOuNTINg suRfaCE. aNy WOOD fOuND NOT TO BE sOuND, 
MusT  BE REPlaCED.
for TorqueMaster
®
 counterbalance systems, a suitable mounting 
surface   (2” x 6”) must be firmly attached to the wall, above the 
header at the center of the opening.  
NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid 
splitting the lumber. Do not attach the mounting surface with nails.
Weather seal (May Not Be Included): 
Cut the weather seal if necessary to fit the header and jambs. 
For quick install track: align the header seal with the inside edge 
of the header and temporarily secure it to the header with equally 
spaced nails. Next, fit the jamb seals up tight against the header 
seal and flush with the inside edge of the jamb. Temporarily secure 
the jamb seals with equally spaced nails. This will keep the bottom 
section from falling out of the opening during installation. Equally 
space nails approximately 12” to 18” apart.
For fully adjustable track: align the header seal 1/8” to 1/4” inside 
the header and temporarily secure it to the header with equally 
spaced nails. Next, fit the jamb seals up tight against the header 
seal and 1/8” to 1/4” inside the jamb. Temporarily secure the jamb 
seals with equally spaced nails. This will keep the bottom section 
from falling out of the opening during installation. Equally space nails 
approximately 12” to 18” apart.
NOTE: Do not permanently attach weather seal to the jamb at this 
time.
hEADROOM REquIREMENT: Headroom is defined as the space 
needed above the top of the door for tracks, springs, etc. to allow the 
door to open properly. If the door is to be motor operated, 2-1/2” (64 
mm) of additional headroom is required.
bACkROOM REquIREMENT: Backroom is defined as the distance 
needed from the opening back into the garage to allow the door to 
open fully.
quICk INsTall TRaCk
fully aDjusTaBlE TRaCk
jaMB
jaMB
WEaTHER 
sEal
WEaTHER 
sEal
1/8” TO 1/4”