Andrew Wireless System CAPL17E19 Benutzerhandbuch
ION®-E Series Low Power Carrier Access Point Installation Guide
M0201AAC
Page 36
© February 2018 CommScope, Inc.
Installing CAP Ls
4
Follow the steps in one of the following sections that apply to securing the desired mounting bracket to
the CAP L:
the CAP L:
•
•
•
5
Use four 5/16-inch or M8 lag screws (or whatever screw type is appropriate for the material to which the
CAP L is to mounted on) to mount the CAP L to the ceiling.
CAP L is to mounted on) to mount the CAP L to the ceiling.
6
Follow the steps in
if grounding is required or preferred.
7
Follow the steps in
(Optional) Ground the CAP L
Follow the steps below to ground the OPA only if grounding is required in your locality or if the installation
plans require the CAP L be grounded. The different CAP L installation procedures will tell you when to ground
the CAP L.
plans require the CAP L be grounded. The different CAP L installation procedures will tell you when to ground
the CAP L.
NOTE:
The CAP L is equipped with an M6 grounding stud located on the back of the unit; however,
grounding is not necessary. CAP Ls are classified as low-voltage devices and do not have internal
power supplies. CommScope recommends checking your local and national electrical codes to
determine if grounding is a requirement.
grounding is not necessary. CAP Ls are classified as low-voltage devices and do not have internal
power supplies. CommScope recommends checking your local and national electrical codes to
determine if grounding is a requirement.
1
Obtain a length of #18 AWG (1.00 mm)
insulated stranded copper wire for use as
a chassis-grounding wire.
insulated stranded copper wire for use as
a chassis-grounding wire.
2
Terminate one end of the wire with a ring
terminal.
terminal.
3
Locate the chassis-ground stud at the rear
of the CAP L enclosure.
of the CAP L enclosure.
4
Remove the Keps nut from the
chassis-ground stud.
chassis-ground stud.
5
Attach the ring end of the wire to the
chassis ground stud, as shown in the
graphic to the right.
chassis ground stud, as shown in the
graphic to the right.
6
Use the Keps nut removed in
to
secure the ground wire to the
chassis-ground stud.
chassis-ground stud.
7
Route the free end of the chassis
grounding wire to an approved (per local
code or practice) earth ground source.
grounding wire to an approved (per local
code or practice) earth ground source.
Ground
stud