RadioFrame Networks Inc MCSERIESHP10 Benutzerhandbuch
MC-Series High-Power System
System Configuration Changes
998--01 Rev X1
RadioFrame Networks, Inc.
CONFIDENTIAL AND PROPRIETARY 127
9 Verify that the displayed Rx Frequency matches the desired receive frequency.
10 Approximately every second, the page reports the current BER measurement
10 Approximately every second, the page reports the current BER measurement
(
BER) and the running average of the ten latest BER measurements (BER Avg).
Record these results, and then select the
Stop Test button.
Note: If the warning “Test Signal Timing Out of Lock” appears, cycle power to the R2660
and set it up again to generate an in-bound 1x6 test signal at the desired frequency
and signal level into the Rx port. It may take a few minutes for the R2660 test signal
to stabilize.
and signal level into the Rx port. It may take a few minutes for the R2660 test signal
to stabilize.
Note: If the only BER measurements reported are 50%, NO DATA, or both, verify that all
procedure steps have been completed. If no problems are found, cycle power to the
R2660 and set it up again to generate an in-bound 1x6 test signal at the desired
frequency and signal level into the Rx port. It may take a few minutes for the R2660
test signal to stabilize. If there's still no change after cycling power to the R2660,
select the Stop Test button.
R2660 and set it up again to generate an in-bound 1x6 test signal at the desired
frequency and signal level into the Rx port. It may take a few minutes for the R2660
test signal to stabilize. If there's still no change after cycling power to the R2660,
select the Stop Test button.
11 When the BER test is complete, lock the RadioBlade transceiver that was under
test.
12 Display the RadioBlade Control page, and lock the RadioBlade transceiver by
selecting its lock icon so that it is closed (locked). Refresh the page every 30
seconds until the
seconds until the
State of the RadioBlade transceiver has changed to ‘2’.
13 Repeat Steps 1 through 11 for each RadioBlade transceiver to be tested on this Rx
port.
14 Move the test leads to the next sector at TOR when all desired blades in the current
sector have been tested and repeat the procedure.
F.6 Equipment Disconnection
Disconnect equipment after completing the BER testing.
1 Disconnect the R2660 from the Rx port under test.
2 Display the RBS Status page, and verify that all RadioBlade transceiver status
2 Display the RBS Status page, and verify that all RadioBlade transceiver status
icons are green.
3 Disconnect the network cable from port 8 of the BIC CRIC.
F.7 BER Test Notes Master
You can use this page to make copies of Table 43 for use as a handy organizer and
permanent record of the BER tests.
permanent record of the BER tests.