Xsilogy Inc. 0920HP Benutzerhandbuch

Seite von 46
Hardware Installation Instructions 
Installation 
Telesensor Installation Procedure 
1.  Disconnect the battery-to-battery lead from the negative terminal of 
the first battery to be monitored, and fasten the negative end of the 
BattGuard shunt to the negative terminal of the battery. 
 
2.  Fasten the loose end of the lead (from step 1) to the positive end of the 
BattGuard shunt. 
 
2-4 
Preliminary Release X1