Installation Check
Checking Equipment
Installation
Cabinet Inspection Items
Cabinet inspection items include:
After completing cabinet installation, make sure the cabinet
fixed and orderly. A row of cabinets should be in line. The
sides of a line of cabinets should keep in the same level, the
error less than 5 mm.
Check whether all fastening pieces are screwed down.
Check whether all components on the cabinet are intact, and
connection are unbroken. Make sure marks orderly, intact and
clear.
Check whether the cabinet surfaces inside and outside are
clean. After cabinet installation completed, it is necessary to
clean up the cabinet surfaces.
Check whether the push-and-pull cover plates of cable outlets
are in proper position. After completing all cable layout, the
cover plate should be pushed forward to the proper position in
case of animals intruding.
Cable Check Items
Power Cable and
ground cable
Inspection
Power cable and ground cable inspection items included:
Check whether all cables are connected well and their polarities
are correct.