Chapter 3 Installation Preparation
�
。Before feeder layout, learn of the wiring route and draw a
practical wiring route on the paper in case feeder crossed
�
The minimum bending radium of feeder is not less than 20
times of the feeder radium.
times of the feeder radium.
�
The requirements of feeder bending radium are as shown in
.
T
ABLE
4 BENDING RADIUM REQUIREMENTS
The Minimum Bending Radius (recommended)
Feeder
Bending
Bending
Bending for Once
Consecutive Bending
(<=15 times)
(<=15 times)
Super–soft
1/2" Feeder
1/2" Feeder
15 cm
30 cm
1/2" Feeder
50 cm
125 cm
7/8" Feeder
90 cm
250 cm
5/4" Feeder
150 cm
380 cm
Binding
Requirements
�
The binding tape is bound neatly and properly, and the spaces
between wire fasteners and directions of fasteners keep con-
sistent.
between wire fasteners and directions of fasteners keep con-
sistent.
�
Cut redundant binding tape and make it flat and tidy.
�
The power cable and protective ground cable are bound sepa-
rately from the signal cable.
rately from the signal cable.
�
The cables inside the cabinet is bound onto a wire bushing.
�
While laying out cables along the cable tray, the cable should
be bound together close.
be bound together close.
�
Remain proper length in cable for inserting and extracting con-
nectors.
nectors.
Technical Material
Preparation
Preparation
It is necessary to prepare the following technical material for
ZXSDR BS8800 C200 installation:
ZXSDR BS8800 C200 installation:
�
ZXSDR BS8800 C200 CDMA Indoor Basestation-8800 Engi-
neering Survey Report
neering Survey Report
�
ZXSDR BS8800 C200 CDMA Indoor Basestation-8800 Environ-
ment Acceptance Report
ment Acceptance Report
ZXSDR BS8800 C200 kit materials include:
�
ZXSDR BS8800 C200 CDMA Indoor Basestation-8800 Technical
Manual
Manual
�
ZXSDR BS8800 C200 CDMA Indoor Basestation-8800 Hard-
ware Manual
ware Manual
Confidential and Proprietary Information of ZTE CORPORATION
17