ZTE Corporation ZXMBW-RA25 Benutzerhandbuch
Chapter 6 Main Antenna Feeder System Installation
Confidential and Proprietary Information of ZTE CORPORATION 53
Jumper and Antenna Connection
and Sealing
and Sealing
Note
: The antenna jumper can be connected before the antenna
is mounted onto the pole and treated for water prevention. This reduces
the time of work high above the ground and improves the connection
and water prevention quality of the connector.
1. Connect the jumper connector to the antenna port and
tighten it.
2. After that, treat the connector for water prevention.
i. Wrap the antenna connector with waterproof tape from
its root in the same direction as the one in which the
jumper is tightened;
jumper is tightened;
ii. Pull the waterproof tape to twice its length. Note that the
next circle must cover half of the previous circle, and the
wrap must stop at the position about 5 cm away from the
jumper connector.
wrap must stop at the position about 5 cm away from the
jumper connector.
iii. Grip the tape with your hands to make the tape tightly
adhered.
iv. Wrap PVC tapes on top of the waterproof adhesive tape.
During the process, make sure the upper layer overlaps
the lower layer by half the width of the tape.
the lower layer by half the width of the tape.
E
ND OF STEPS