ZTE Corporation ZXMBW-RA25 Benutzerhandbuch

Seite von 99
 
 
Chapter 6 Main Antenna Feeder System Installation 
 
Confidential and Proprietary Information of ZTE CORPORATION      53 
Jumper and Antenna Connection 
and Sealing 
 
 Note
:  The antenna jumper can be connected before the antenna 
is mounted onto the pole and treated for water prevention. This reduces 
the time of work high above the ground and improves the connection 
and water prevention quality of the connector.  
 
1.  Connect the jumper connector to the antenna port and 
tighten it. 
2.  After that, treat the connector for water prevention. 
i.  Wrap the antenna connector with waterproof tape from 
its root in the same direction as the one in which the 
jumper is tightened; 
ii.  Pull the waterproof tape to twice its length. Note that the 
next circle must cover half of the previous circle, and the 
wrap must stop at the position about 5 cm away from the 
jumper connector.  
iii.  Grip the tape with your hands to make the tape tightly 
adhered. 
iv.  Wrap PVC tapes on top of the waterproof adhesive tape. 
During the process, make sure the upper layer overlaps 
the lower layer by half the width of the tape.  
E
ND OF STEPS